Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Hebei Paris International  Trading Co.,LTD

Sales & Support:

Home ProductsSpring Hanger Supports

1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping

I'm Online Chat Now

1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping

1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping
1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping 1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping

Large Image :  1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping

Product Details:
Place of Origin: Cangzhou ,Hebei Pro ,China
Brand Name: OEM
Certification: CNAS ,PED ,CE,ISO
Model Number: DN15-DN5000
Payment & Shipping Terms:
Minimum Order Quantity: 20 Set
Price: 80USD/Set
Packaging Details: Wooden case/pallet , or as per customer's requirements
Delivery Time: within 30 days
Payment Terms: L/C, L/C, T/T, Western Union, MoneyGram
Supply Ability: 1000/Sets per Month
Detailed Product Description
Type: Spring Material: Carbon Steel
Max. Recommended Load:: 154~217384N Standard: GB,BS,ANSI
Working Temperature: -20℃~200℃ Model: VS60F、VS90F、VS120F、VS150F、VS180F
Displacement Range: VS(0~180mm)、TD(0~120mm) Color:: Gray
Type:: Farm Cultivator After-sales Service: Engineers Available To Service Machinery Overseas
High Light:

1M Constant Load Hanger

,

Constant Load Hanger 400kN

,

400kN Spring Support In Piping

Tubular Frame Swivel Clamp Used For Fire Sprinkler Hangers Spring Hanger Supports

 

Tubular frame,fire spinkler spring hanger support,industy spring hanger, 

 

Purpose and scope of application:

 

This standard is applicable to variable spring supports and hangers with displacement range of vs (0 ~ 180mm), TD (0 ~ 120mm), load range of 154 ~ 217384n and service temperature range of - 20 ℃ ~ 200 ℃

(1) According to the installation load provided by the user, the manufacturer uses the upper and lower positioning blocks to fix the indicator plate of the spring support and hanger at the position corresponding to the installation load, so that the spring support and hanger is temporarily in a rigid state.

(2) After cleaning and hydrostatic test, remove the upper and lower positioning blocks before putting the pipeline into use.

(3) When the pipeline starts to run, first check whether the positioning block is removed, and then check whether the indicator board is jammed during the displacement process from installation load to working load.

(4) After the pipeline is put into normal operation, check whether the displacement of spring support and hanger under working load is consistent with the design. After the pipeline stops running, check whether the indicator board is reset to the position of installation load. Check the tightness of spring hanger

 

Advantages

 

The tube spring  hanger support  structure omits the bottom chord longitudinal members and the ball joint of the grid structure, which can meet the requirements of various building forms, especially the construction of circular arch and arbitrary curve shape is more advantageous than the grid structure. It has the same stability in all directions and saves material consumption

 

1M Length 400kN Swivel Clamp Constant Load Hanger / Spring Support In Piping 0

Contact Details
Hebei Paris International Trading Co.,LTD

Contact Person: Mr. Terry ding

Tel: 18330713028

Fax: 86-317-6013869

Send your inquiry directly to us (0 / 3000)