Product Details:
Payment & Shipping Terms:
|
Connection: | Welding | Color: | Black/Metallic/Required |
---|---|---|---|
Transport Type: | By Sea By Air | Wall Thickness: | Sch5S-Sch XXS |
Special Design:: | We Can Produce According To Your Drawings | Material: | Alloy Steel, Carbon Steel, Stainless Steel |
Surface Treatment: | Black Painting, Anti-rust Oil | Price: | Negotiate |
Packaging: | In Wooded Cases Or Pallets, Or As For Clients' Requirements | Applications: | Petroleum, Chemical, Power, Gas, Metallurgy, Shipbuilding, Construction, Etc |
High Light: | dn15 carbon steel pipe fittings,sch5s carbon steel pipe fittings,sch5s carbon steel 90 degree elbow |
Product Description
GOST Lr 90deg Carbon Steel 20# Elbow Connector
GOST Lr 90deg Carbon Steel 20# Elbow Connector
Butt welding pipe fittings - Elbow | |
Standards | ASME/ANSI B16.9, ASME/ANSI B16.11, ASME/ANSI B16.28,JIS B2311, JIS B2312, DIN 2605, DIN 2615, DIN 2616, DIN 2617, BS 4504, GOST 17375, GOST 30753, GOST 17378 |
Bending radius | Short Radius(SR), Long Radius(LR), 2D, 3D, 5D, multiple |
Degree | 45 / 90 / 180, or customized degree |
Size Range | Seamless type: ½" up to 28" |
Welded type: 28"-to 72" | |
WT Schedule | SCH STD,SCH10 to SCH160, XS, XXS, |
Carbon Steel | A234 WPB, WPC; A106B, ASTM A420 WPL9, WPL3, WPL6, WPHY-42WPHY-46, WPHY-52, WPHY-60, WPHY-65, WPHY-70, |
Alloy Steel | A234 WP1, WP11, WP12, WP22, WP5, WP9, WP91 |
Special Alloy Steel | Inconel 600, Inconel 625, Inconel 718, Inconel X750, Incoloy 800, |
Incoloy 800H, Incoloy 825, Hastelloy C276, Monel 400, Monel K500 | |
WPS 31254 S32750, UNS S32760 | |
Stainless Steel | ASTM A403 WP304/304L, WP316/316L, WP321, WP347, WPS 31254 |
Duplex stainless steel | ASTM A 815 UNS S31803, UNS S32750, UNS S32760 |
Applications | Petroleum industry, chemical, power plant, gas piping, shipbuilding. construction, sewage disposal,and nuclear power etc. |
Packaging material | plywood cases or pallets, or as per customer's requirements |
Production Period | 2-3weeks for normal orders |
FAQ
How long is your delivery time?
Reply:Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity
Do you provide samples ? is it free or extra ?
Reply:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Packaging & Dlivery
Shipping Ways
|
By sea, it is convenient for bulk orders.
Cheap shipping cost, usually takes 30-60 days.
|
By air, quick delivery, for not very heavyweight orders.
Cheaper than Express. Takes around 7-12 days.
|
|
By express, samples, and small order.
A little expensive, but very quickly, usually 7-10 days, door to door.
|
|
Packing Details
|
Cartons, Or according to the buyer's requirements.
|
Delivery Details
|
According to the quantities and specifications of each order.Normal delivery times are from 25 to 45 days after receiving the deposit.
|
Why choose us?
1. 20 years of manufacturing and developing experience;
2. A Strong R & D team;
3. Service experience for thousands of customers at home and abroad;
4. Export to 30 countries including Southeast Asia, East Asia, Eastern Europe and Central Asia;
5. Three casting production lines with stable casting quality, high production efficiency and fast delivery ti
Contact Person: Mr. Terry ding
Tel: 18330713028
Fax: 86-317-6013869